1) Offerings
What we do
Techedge delivers solar projects with a focus on engineering integrity, safe execution, and long-term reliability —
not lowest-cost installation.
| Area | What you get |
|---|---|
| Rooftop On-Grid Solar (C&I) | Design, supply, installation, commissioning, documentation and handover. |
| Hybrid Solar + Battery | Critical load planning, backup sizing (kWh), hybrid inverter settings, monitoring. |
| Off-Grid Systems | Schools, clinics, remote sites — stable solar + storage with safe distribution. |
| Cold Chain / Agriculture | Solar cold rooms, pumps, rural power systems with practical constraints. |
| O&M / Performance Audit | Performance checks, cleaning schedule, fault analysis, generation reporting. |
| Retrofit & Upgrades | Inverter replacement, protection upgrades, monitoring add-on, PF/quality checks. |
Note: We share clear assumptions (roof type, shadow, electrical room distance, utility model)
before finalising price and timeline.
2) How we execute (simple, disciplined)
ProcessStep 1
Site Survey + load understanding
Step 2
Engineering: SLD + protections + BOM
Step 3
Utility coordination (as applicable)
Step 4
Installation + QA + commissioning
Client clarity: We make the scope and exclusions clear upfront — that avoids surprises during execution.
3) Scope of work (Turnkey EPC)
Scope| Scope item | Details |
|---|---|
| Site survey & engineering | Shadow check, cable routes, SLD, BOM, protections, earthing plan. |
| Supply & logistics | Modules, inverters, structure, cables, protections, DBs, monitoring (as per BOM). |
| Installation & QA | Mounting, DC/AC works, earthing, SPD/MCB/isolators, labeling and testing. |
| Utility coordination | Support for approvals / synchronization as applicable (state/utility-dependent). |
| Commissioning & handover | Testing, monitoring setup, as-built docs, warranty pack, training. |
Typical exclusions: Non-electrical civil works, major roof repair, trenching beyond agreed scope,
and client-side internal electrical modifications (unless explicitly included).
4) Approved makes (project-dependent)
Equipment| Category | Typical options |
|---|---|
| Solar modules | TOPCon / MonoPERC options based on availability and bankability (export-grade options available). |
| Inverters | On-grid / Hybrid (single/three-phase) as per system type and compliance. |
| Structure | Roof-specific structure, corrosion-resistant fasteners, wind-load aware design. |
| Protection | DCDB/ACDB, SPD, isolators, MCB/MCCB/RCBO as required. |
If you want a specific brand (Goldi/Waaree/Vikram etc.), we can lock makes during proposal finalisation.
5) Why Techedge
Assurance| Area | What it means |
|---|---|
| Engineering integrity | Sizing based on load reality, site constraints and safe protection coordination. |
| Execution quality | Clean mounting, routing, earthing, terminations and labeling — serviceable long-term. |
| Documentation first | SLD, test reports, photo set, warranty pack, handover checklist. |
| Support mindset | Post-commissioning support with AMC/O&M options, performance reviews. |
Our promise: clean execution, safe protections, and documentation that stands up for client, bank, and auditor.
Contact (Request a proposal)
Get started
Share your requirement. We will respond with clear assumptions and the next steps.
Phone / WhatsApp
+91 98440 97096
sales@crewtec.in
Next steps:
| Step | Action |
|---|---|
| 1 | Share site details (location, roof type, EB bill / load) |
| 2 | Techedge survey + assumptions confirmation |
| 3 | Proposal + BOM + commercials (clear inclusions/exclusions) |
| 4 | Order confirmation + execution plan + timeline |