Techedge SPE India Pvt. Ltd. • Solar EPC

Excellence in Solar Engineering • Towards a Greener World

Email WhatsApp

Solar EPC + Hybrid + Off-grid • Built like a bankable proposal

A clean, decision-friendly website focused on scope, offerings, execution process, and how to engage Techedge.
Live (single-page) Solar EPC • Hybrid • Off-grid • O&MEngineering-led executionProposal + BOM + Scope clarityNetlify contact form enabled

1) Offerings

What we do
Techedge delivers solar projects with a focus on engineering integrity, safe execution, and long-term reliability — not lowest-cost installation.
Area What you get
Rooftop On-Grid Solar (C&I) Design, supply, installation, commissioning, documentation and handover.
Hybrid Solar + Battery Critical load planning, backup sizing (kWh), hybrid inverter settings, monitoring.
Off-Grid Systems Schools, clinics, remote sites — stable solar + storage with safe distribution.
Cold Chain / Agriculture Solar cold rooms, pumps, rural power systems with practical constraints.
O&M / Performance Audit Performance checks, cleaning schedule, fault analysis, generation reporting.
Retrofit & Upgrades Inverter replacement, protection upgrades, monitoring add-on, PF/quality checks.
Note: We share clear assumptions (roof type, shadow, electrical room distance, utility model) before finalising price and timeline.

2) How we execute (simple, disciplined)

Process

Step 1

Site Survey + load understanding

Step 2

Engineering: SLD + protections + BOM

Step 3

Utility coordination (as applicable)

Step 4

Installation + QA + commissioning

Client clarity: We make the scope and exclusions clear upfront — that avoids surprises during execution.

3) Scope of work (Turnkey EPC)

Scope
Scope itemDetails
Site survey & engineering Shadow check, cable routes, SLD, BOM, protections, earthing plan.
Supply & logistics Modules, inverters, structure, cables, protections, DBs, monitoring (as per BOM).
Installation & QA Mounting, DC/AC works, earthing, SPD/MCB/isolators, labeling and testing.
Utility coordination Support for approvals / synchronization as applicable (state/utility-dependent).
Commissioning & handover Testing, monitoring setup, as-built docs, warranty pack, training.
Typical exclusions: Non-electrical civil works, major roof repair, trenching beyond agreed scope, and client-side internal electrical modifications (unless explicitly included).

4) Approved makes (project-dependent)

Equipment
CategoryTypical options
Solar modules TOPCon / MonoPERC options based on availability and bankability (export-grade options available).
Inverters On-grid / Hybrid (single/three-phase) as per system type and compliance.
Structure Roof-specific structure, corrosion-resistant fasteners, wind-load aware design.
Protection DCDB/ACDB, SPD, isolators, MCB/MCCB/RCBO as required.
If you want a specific brand (Goldi/Waaree/Vikram etc.), we can lock makes during proposal finalisation.

5) Why Techedge

Assurance
AreaWhat it means
Engineering integrity Sizing based on load reality, site constraints and safe protection coordination.
Execution quality Clean mounting, routing, earthing, terminations and labeling — serviceable long-term.
Documentation first SLD, test reports, photo set, warranty pack, handover checklist.
Support mindset Post-commissioning support with AMC/O&M options, performance reviews.
Our promise: clean execution, safe protections, and documentation that stands up for client, bank, and auditor.

Contact (Request a proposal)

Get started
Share your requirement. We will respond with clear assumptions and the next steps.

Phone / WhatsApp

+91 98440 97096

Email

sales@crewtec.in

Send on WhatsApp
Note: Form submission works after deployment on Netlify (not always on localhost).
Next steps:
StepAction
1Share site details (location, roof type, EB bill / load)
2Techedge survey + assumptions confirmation
3Proposal + BOM + commercials (clear inclusions/exclusions)
4Order confirmation + execution plan + timeline